欧美午夜精品人妻久久久久,刑警娇妻穿着乳环被调教 ,夜夜操亚洲女人,一级a做片免费久久无码

Language:CHINESESENGLISH

Home > News > How to ensure the safe use of steel structure?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.e-sosa.com

How to ensure the safe use of steel structure?

Time:[2021-10-13]  Hits:2369

How to ensure the safe use of steel structure?

With the rapid development of factory buildings in China, steel structures are more and more widely used. As we all know, the application of steel structure in plant construction is very important. Therefore, the following problems must be paid attention to when storing and installing steel structures to ensure the safe use of steel structures.

1. The specification, steel number, quantity and material acceptance certificate number of the steel shall be indicated at the end of the steel.

2. When stacking in the open air, the site shall be flat, the height shall be higher than the surrounding ground, and there shall be drainage channels around.

3. During stacking, the back of the steel section shall be upward or outward as far as possible to avoid the accumulation of snow and water. There shall be a height difference between the two ends to facilitate drainage.

4. Before installation, the construction unit shall conduct special inspection on the product certificates, design documents and pre assembly records of parts, and recheck the dimensions of parts.

5. Appropriate connection mode shall be adopted for steel structure to make the node design consistent with the simplified structural calculation model.

6. When hoisting the steel structure, appropriate measures shall be taken to prevent excessive bending and torsional deformation, and washers shall be added to the contact part between the wire rope buckle and the member to prevent the member from being injured.

7. When the steel structure is in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

8. High altitude operators shall use tools, and spare parts shall be placed in the tool bag rather than thrown up and down

9. When working in rainy days, reliable anti-skid measures must be taken, and pay attention to lightning protection in thunderstorm season.

10. The weather conditions before construction are also optimistic, and it is forbidden to use winds of level 4 or above.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
兰溪市| 定襄县| 定日县| 万载县| 泰和县| 宁明县| 铁力市| 普洱| 安化县| 文水县| 嵩明县| 古交市| 恩平市| 福泉市| 威宁| 旅游| 扎鲁特旗| 鄱阳县| 江津市| 松滋市| 通城县| 固始县| 勃利县| 忻州市| 南华县| 方城县| 陈巴尔虎旗| 怀化市| 龙游县| 怀安县| 澳门| 南部县| 贺州市| 遂昌县| 靖州| 连平县| 大埔区| 文登市| 区。| 洪湖市| 疏勒县|