欧美午夜精品人妻久久久久,刑警娇妻穿着乳环被调教 ,夜夜操亚洲女人,一级a做片免费久久无码

Language:CHINESESENGLISH

Homepage > Product > Guangya steel villa
Contact Us
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:梁先生/Mr Leung
  • Phone:18900873383/18900873268
  • E-mail:sbs@sbsprefabhouse.com
  • Skype: sbs-Candy
  • URL:http://www.e-sosa.com

Guangya steel villa

Guangya steel villa

 

 

Guangya steel villa

1.Engineering case:

 

2.Steel structure panel materials

steel structure panel Material:including wall panel and roof panel

Sandwich plate core material material: EPS, rock wool, PU, glass wool

Sandwich board material thickness: 50 mm, 75 mm, 100 mm, 150 mm

Single color plate material thickness: 0.376 mm, 0.426 mm and 0.476 mm

 

 

 

3.Product details

Main structure Steel Welded H Section
Purlin C Section Channel or Z Section Channel
Roof Cladding Sandwich Panel or Corrugated Steel Sheet with Fiber Glass Wool Coil
Wall Cladding Sandwich Panel or Corrugated Steel Sheet
Tie Rod Circular Steel Tube
Brace Round Bar
Column & Transverse Brace Angle Steel or H Section Steel or Steel Pipe
Knee Brace Angle Steel
Roof Gutter Color Steel Sheet
Rainspout PVC Pipe
Door Sliding Sandwich Panel Door or Metal Door
Windows PVC/Plastic Steel/Aluminum Alloy Window
Connecting High Strength Bolts
Packing Can be loaded into 40ft'GP/HQ/OT, or 20 ft'container.
Drawing We can make the design and quotation according to your requirement or your drawing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.Advantage:

1)Quick and easy to assemble
2)Dry construction and environmentally friendly.
3)Light houses with strength structure
4)Excellent capacity of water proof, heat and sound insulation.
5)Materials 100% recyclable
6)Convenient to take apart and install.
7)Dry construction condition; no pollution; no waste.
8)During the construction, total saving 1/6 of CO2 Emissions, 1/6 of natural resources, 1/6 of natural energy and 9/10 of water using. Save labor cost on site.
9)The building self-weight is only 1/4 of brick-concrete structure.
10)Galvanized steel is 100% recyclable.
11)Fiber glass insulation filling in the roof is greatly superior to the brick structure on the effect of insulation and soundproof.

 

 

5.Service flow path:

Discussing Project——Design Plan Drawing——Budget & Quote——Confirm Drawing&Quotation——Sign the Contract——Make the shop Drawing——Manufacturing——Transportation——Shipping——Foundation Ready——Guidance Installation——Finshed Installation

 

 

Contact way

1)FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD
2)Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District,
3)Foshan, Guangdong Province, China
4)Tel:0086-757-63323396/0086-757-18900873268 Fax:0086-757-81196682

Hits:10157 Time:[2024-11-23]

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
南昌县| 华阴市| 辰溪县| 高雄县| 大港区| 长阳| 福贡县| 垫江县| 齐河县| 孝义市| 筠连县| 涿州市| 监利县| 汉中市| 房山区| 扶沟县| 祥云县| 天台县| 宝兴县| 红原县| 瑞丽市| 连平县| 东安县| 寿光市| 上饶市| 五大连池市| 略阳县| 甘洛县| 江陵县| 鄂尔多斯市| 延寿县| 峨眉山市| 嘉鱼县| 巴林右旗| 建阳市| 葵青区| 全南县| 南丹县| 六安市| 西林县| 称多县|