Winter construction measures for metal workshop building

Time:[2021-11-24]  Hits:2691

a. The winter construction of steel structure production and installation shall be carried out strictly in accordance with the relevant steel structure winter construction regulations.

b. When steel components are installed at positive temperature and at negative temperature, the shrinkage of components should be considered according to the difference in ambient temperature, and technical measures to adjust deviation should be taken during construction.

c. Welders who participate in the construction of negative temperature steel structures should undergo negative temperature welding process training, pass the examination, and obtain corresponding certificates.

d. The steel and related connecting materials used under negative temperature must be accompanied by a quality certificate, and the performance meets the requirements of the design and product standards.

e. The welding rod used under negative temperature shall not be exposed for more than 2 hours, and it shall be re-baked after more than 2 hours, and the number of baking of the welding rod shall not exceed 3 times.


f. Bake the flux according to the regulations before use, so that the water content does not exceed 0.1%.

g. High-strength bolts used under negative temperature must have a product certificate, and the torque coefficient and axial force must be re-inspected under negative temperature.

h. The paint used for steel structure under negative temperature shall not use water-based paint.

i. When the component is blanked, a shrinkage margin should be reserved, and the welding shrinkage and compression deformation should be coordinated with the shrinkage deformation of the steel under negative temperature.

j. When assembling the components, expand the assembly from the inside to the outside according to the order stipulated by the process, and do a test during the assembly of the negative temperature to determine the shrinkage value of the weld that needs to be reserved.

k. When assembling components, remove rust, burrs, soil, oil, ice and snow and other debris remaining in the joint 50mm, and keep the joints dry and free of residual moisture.

l. Multi-layer welding should be used when welding steel plates above 9mm under negative temperature. The welds should be welded layer by layer from bottom to top. Each weld is completed at a time. If the welding is interrupted, the welding defects should be removed before welding again. It is strictly forbidden to start the arc on the welding base metal.

m. When the steel structure is installed on site, in case of snow or wind speed above 6m/s, set up a protective shed.

n. The unqualified welds shall be removed and re-welded, and the welding shall be carried out in accordance with the provisions of the welding process of the steel structure under negative temperature.

o. When the ambient temperature is lower than 0°C, perform the painting process test before applying the anti-corrosion coating. When painting, the rust, oil stains, burrs, etc. on the surface of the component must be cleaned up, and the surface must be kept dry. No painting work is allowed in snowy weather or when there is thin ice on the components.

p. Take anti-skid measures when transporting and stacking steel structures in winter. The component stacking site is flat and solid without puddles, and the ground is free of icing. When the components of the same model are stacked, the components should be kept horizontal, and the shims should be placed on the same vertical line to prevent the components from slipping.

q. Before the steel structure is installed, its quality shall be re-inspected according to the requirements under negative temperature conditions, and the components that have been missed in the production and deformed during transportation and stacking shall be repaired and corrected on the ground.

r. When using steel cables to hoist steel components, anti-skid spacers should be added, the gusset plate that is hoisted at the same time as the components, and the fixtures required by the installer should be tied firmly with ropes.

s. According to the temperature conditions, the steel component installation sequence chart is compiled, and the installation shall be carried out in strict accordance with the specified sequence during construction.

t. Prepare the welding process for steel structure installation, and both ends of a component shall not be welded at the same time.

u. Before installation, remove ice, snow and dew on the surface of the components, but do not damage the coating.

v. Columns and main beams installed at negative temperature shall be corrected immediately, and the correct position shall be immediately fixed permanently. The components installed on the same day shall form a stable space system.

w. When installing high-strength bolt joints, there must be no snow or ice on the friction surface of the components, and no contact with dirt, oil and other stolen objects.

x.In addition to complying with the requirements of "Code for Construction and Acceptance of Steel Structure Engineering" (GB50250-95), the quality of steel structure installation under negative temperature should also be inspected and accepted according to design requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
99精品免费久久久久久久久日本| 综合图片第二页| 男生和女生吊鸡| 蜜桃臀国产福利在线播放| 小说纵横官场之权色无边| 外网视频嗯嗯啊好大抽插| 九色porny福利导航| 中文a∨字幕一区二区三区| 成人麻豆日韩在无码视频| 看一级毛片**直播在线| 一个色综合亚洲美女图片| 欧美精品国产精品日韩精品| 射的太快| 骚货鸡巴视频淫| 国产av人人夜夜澡人人爽麻豆| AV亚欧洲日产国码无码| 国内精品久久久久影院6| 亚洲国产精品无码区二本| 久视频精品免费观看99| 亚洲一码二码三码精华液| 妇女BBBB插插插视频| 夾肏正在:播放| 噜噜色青草久久丁香伊人| 国产成人18黄网站在线观看软件| aa级欧美大片在线观看| 国产成人区一区二区三区| 九九热激情视频免费观看| 偷窥亚洲综合| 裸身大美女被操视频网站| 国产成人 亚洲欧洲 综合| igao视频网在线观看| 青青青在线播放视频国产| 日本中文字幕在线视频站| 色吊丝中文字幕资源在线| 人人玩人人添人人澡超碰| 男人射女人骚逼| 大鸡巴插入网站| 么公吃我奶水边吃饭边做| 无码一区二区三区乱子伦| 国产精品日韩在线亚洲一区| 99热这里都是国产精品|