Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2497

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
av熟妇人妻一区二区三区| 操逼舔阴蒂视频| 哦┅┅快┅┅用力啊熟妇| 人妻出差被寝取中文字幕| 精品国产乱码久久夜夜嗨| 欧美精品性视频在线观看| 国产精品蜜桃麻豆色哟哟 | 性无码专区一色吊丝中文| 噜噜噜久久久噜噜噜久久久 | 大学女厕课间沟拍大屁股| 年轻的妺妺a片| 一本久久久久久久久久道| 精品国产区二区三区AV| 操逼好爽好爽视频免费看| 日本3级片久久| 窝窝午夜成人看A级无码| 调教女同在线观看中文字幕| 韩国三级电影 色即是空| 亚洲欧洲av综合色无码| 久久久亚洲欧洲日产AV| 无码人妻精品一区二区三| 欧美伦理在线观看完整版| 夜片视频在线观看视频 | 又大又粗征服女省委书记| 中文字幕专区在线第一页| 白洁新婚之夜第一章| 69视频在线观看快操我| 大鸡吧日b视频| 国产更衣室视频在线观看| 欧美猛少妇色xxxx猛叫| 黄色av免费在线观看网站| 三上悠亚公侵犯344在线观看| 奇米影视盒久久精品影视| 国产亚洲综合欧美在线热| 亚洲av高清一区三区三区| 色羞羞在线观看| 国产精品久久久久久无码| 嗯……不要轻点色色视频| 国产av一区二区三四区| 国产大尺度激情无码视频| 水蜜桃久久夜色精品一区|