欧美午夜精品人妻久久久久,刑警娇妻穿着乳环被调教 ,夜夜操亚洲女人,一级a做片免费久久无码

Language:CHINESESENGLISH

Home > News > What problems should be noticed in foundation construction of Foshan steel structure building?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.e-sosa.com

What problems should be noticed in foundation construction of Foshan steel structure building?

Time:[2018-9-15]  Hits:4721

Now a lot of buildings are built with steel structure, because Foshan steel structure has a very good installation effect, and seismic capacity is also very good, the price is also will, but also easy to install. But when building foundation, we should pay attention to it. Attention should be paid to building foundation.
1. Choose the suitable foundation method, some may adopt the natural foundation, some may adopt the artificial foundation, the different soil layer uses the different foundation method.
2. in the process of foundation construction, pile foundations can be used.
Foshan steel structure building foundation construction, should adopt targeted foundation, if not stable enough, can adopt a targeted stability policy.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
博乐市| 高邮市| 凭祥市| 乌兰浩特市| 沁水县| 大同市| 五台县| 改则县| 左云县| 定日县| 噶尔县| 平江县| 尚义县| 浦北县| 阿城市| 上高县| 张掖市| 西峡县| 水富县| 花莲县| 和顺县| 周口市| 大新县| 东莞市| 柳州市| 南川市| 内江市| 六盘水市| 康乐县| 屏边| 静宁县| 天柱县| 叙永县| 遂川县| 新绛县| 富蕴县| 金溪县| 临潭县| 河南省| 同仁县| 枣庄市|