Construction measures of Foshan steel structure during rainy season

Time:[2017-9-27]  Hits:4590

First, Foshan steel structure project rainproof measures
Arrange special people to know the weather forecast in time and master the weather data in advance. Arrange the inspection management of special site in rain, do not comply with the rainproof measures or measures non-standard place, must subcontract deadline ordered rectification, especially for lightning protection measures must be carefully check all.
Two, Foshan steel formwork rainproof measures
When the formwork is stacked, the lower layer must be ground with the ground to prevent the rain from soaking and damaging. At the template stacking site, effective ground drainage measures must be taken to prevent rainwater from depositing.
Three. Rainproof measures for reinforcing bars
L for the site to place a longer time to prevent rain reinforcement steel cover, prevent serious corrosion of reinforcement. The steel stacking site must have good drainage to prevent rainwater from depositing and soaking the corroded reinforcement.
2 Foshan steel structure rainproof measures
To ensure the normal construction period, ensure the quality of the project. The main process of the project and the climate sensitive process, should be based on the characteristics of the rainy season construction, the preparation of the corresponding measures.
High strength bolts shall not be installed on rainy days, and no rain water shall be allowed on friction surfaces and high-strength bolts. During rainy weather, can not meet the requirement of production and can not guarantee the safety of construction, should stop construction. At this point, attention should be paid to ensure the safety of the work surface, set up the necessary temporary reinforcement measures. Steel structure hoisting must hang net in the outside of the building facade, building stairs, building adjacent edges and can not cover the holes to set up protective railing. For the components to be lifted, the water on the surface of the component shall be cleaned first, especially the friction surface of the component, and the surface layer shall be dried
3 、 welding of Foshan steel structure
Before the construction, should be in the operating platform than at the height of 1m welding with flame retardant woven cloth is tightly wrapped around the pillar, and the platform plane caves with asbestos clothgai Yan, so that the wind and the welding slag splashing down. In principle, outdoor welding is not performed on rainy days. Welding machine, welding wire, the cylinders should be placed in a special shed. So as not to damp the welding material.
4. Installation of high strength bolts for steel structure in Foshan
The use of high-strength bolt, high strength bolt with visual inspection, there shall be no rust, damage thread phenomenon, such as repair after use. Keep the connection clean and dry.
5, Foshan steel structure scaffolding rainproof measures
Rain, rain must be checked one by one to the scaffold fastener, and must check the scaffolding foundation is firmly in the inspection process. In the inspection process, construction and inspection personnel must ensure their own safety, protective measures in place, pay attention to anti-skid, fall prevention, is strictly prohibited command.
6, Foshan steel structure rain proof measures
All kinds of electrical leakage protection device must be sensitive, all kinds of construction line check, insulation outsourcing must be in good condition without damage, prevent leakage of rainwater electric wounding; outdoor setting electric welding machine, grinding machine, threading machine and other equipment should be set up under the upper canopy, take the method of preventing the rain soaked pad. Power line is not erected, bare or plastic wire, distribution box must rain. Metal mechanical and electrical equipment must adopt zero reliable protection, leakage protection device for motor switch box should be reliable. Any mechanical operator must be certified and wear insulated rubber gloves and insulated gloves as required. In case of heavy rain to stop all electrical and mechanical operations, the electric field of steel processing field must turn off the power, after the rain should timely check the organization safety performance of machinery, electrical appliances, rain weather prohibited lifting equipment and components and manual handling of materials or equipment etc.. The cable wires and wires used in the field are strictly forbidden to be soaked in rainwater or laid on wet ground. Overhead installation or underground installation and safe and reliable protection measures should be installed. Before the construction of the rainy season, the power supply, electric box, tower crane grounding, insulation and other projects shall be measured and recorded. After the rain, all electrical equipment and electrical boxes should be checked once. The doors of each electric box must be closed and must not be opened.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
小卖部丰满老熟女嗷嗷叫| 男人和女人操逼毛片网站| 久久久久久影院嗯啊别揉| 欧美黑屌插菊花| 男生捅女生屁股黄色视频| 大屁股肥逼美女操逼视频| 日韩电影免费在线观看网址| 日本欧美一区二区三区高清| 国产白嫩漂亮ktv在线| 香蕉伊思人在钱国产在线| 国产av精品综合色一区| 亚洲永久无码7777kkk| 狠狠v日韩v欧美v天堂| 奇米影视首页| 国产精品免费在线观看性| 奸污肏美女小穴嫩逼视频| 日日摸人人看97人人澡| 国产乱子伦视频在线播放| 拔萝卜高清在线视频观看| 五月天影院午夜| 无码中文字幕无av专区| 国产精品乱码妇女bbbb| 久久综合图片| 永久939w79w99w乳液| 台湾佬中文网| 亚洲AV无码久久精品老| 国产高清性生活免费视频| 太粗太硬小寡妇受不了视频| 国产a国产a国产aaaa| 美女大鸡操很多水在线看| 欧美精品538在线视频| 中文字幕第一区二区三区| 黑人肉棒操着骚逼好舒服| 国产精品喷水一区二区三区| 老婆中文字幕乱码中文乱码| 鸡鸡查鸡鸡网站| 91情侣偷在线精品国产| 天天日天天操天天干天天| 欧美一级伦奷片在线播放| 亚洲人成网站精品片在线| 日本v片免费一区二区三区|