As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国严精品毛片av一区二区| 午夜av在线一区二区三区| 公交车被cao得合不拢腿视频 | 欧美xxxxx高潮喷水麻豆| 男人鸡巴插女人BB视频| 操黑森林逼视频| 美女与肉棒羞羞答答视频| 午夜tv无码免费区喷水| 男生操美女黄色视频网站| 国产老熟女乱子一区二区| 中国大阴蒂操逼| 波多野结衣操屄| 欧美第一次开笣| 欧美大肥婆大肥bbbbb| 99热思思干这里只有精品| 欧美《熟妇的荡欲》未删减版| japanese日本丰满少妇| 好大好BBB爽免费视频| 中文字幕人妻丝袜乱一三区| 中日韩黄色视频| 中文字幕无线码一区二区| 把腿扒开让我添30分钟视频| 被操的啊啊啊啊啊啊视频| 熟女chachacha性少妇| 日韩在线视频| 久久久久久久久久久本色| 大操逼视频鸡巴| 日韩大屁股一区二区三区| 膜下面爆操视频| 50多岁老女人三级全黄| 美女把双腿张开让男人捅| 在线观看不卡av中文字幕| 产后52天有黄色分泌物| 帅气体育生gary网站mv软件| 亚洲av天堂综合网久久| 国产女人插BB| 激情A片久久久久久播放| 波多野结衣中文字幕一区| 一区二区三区中文字幕| 911国产在线观看精品| 99久久免费国产精品6|