Foshan main steel members (b)

Time:[2016-5-14]  Hits:5445

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
粗大的猛烈进出视频免费| 日产一线二线三线区别图片| 欧美中文字幕无线码视频| 大几把操逼锁屏| 神马国产精品影院av一区| 别揉我奶子一区二区三区| 花火视频影视大全免费观看 | 精品欧美一区二区三区四区| 在车子颠簸中进了老师的身体| 国产a毛片高清视频成人| 大吊日美女大学生逼视频| 嗯啊嗯啊操逼网| 大鸡巴肏小骚逼免费图片| 波多野结衣中文字幕在线| 美女被插直流水| 超97在线观看精品国产| 东北老女人熟女啪啪视频| 日本美人妻中文字幕在线| 啊啊啊啊我的逼好爽视频| 亚洲一级777av网站| 人妻仑乱少妇88MAV| 男生的机机桶入女生的逼| 52avhaose好色| 午夜福利不卡片在线播放| 啊,不要快操我视频内射| 中文字幕久久人妻熟人妻| 亚洲精品国产自在现线看| 狼群社区www在线中文| 欧美 亚洲 呦呦 自拍| 久久精品国产亚洲av热片| zoz○zo女人和另类zoz0| 美女扒开大腿流白浆动漫| 欧美日韩极品综合一区二区| 人妻中文字字幕在线乱码| 无码av一区二区免费看| 午夜亚洲欧洲av永久精品| 宫交拔不出来h| av午夜男女刺激爽影院| 丝袜人妻丝袜美腿呻吟视频| 奇米影视首页| 人与嘼av免费|