Large Steel Sliding Installation Technology of

Time:[2016-3-23]  Hits:4345

Large Steel Sliding Installation Technology of


1. Guangzhou Steel Main content
Computer-controlled mass jacking and lifting technology is an advanced steel structure and installation of large equipment technology, which combines mechanical, hydraulic, computer control, sensor monitoring technology, and technology to solve the traditional hoisting of large crane and lifting machinery height, weight lifting, structure, surface contact, job sites and other fields insurmountable problems. With this construction technique is safe and reliable, mature technology, advanced technology, significant economic benefits. The technology uses a "flexible strand bearing, hydraulic cylinder cluster, computer-controlled synchronous lifting" principle. When lifting or jacking construction precisely controlled by computer at various points synchronization.
2. Guangzhou Steel Technical Specifications
Lifting or jacking determine the program, you must also consider the load-bearing structure (permanent or temporary) and the lifting device itself or the steel strength, stiffness and stability. To make the overall force structure under construction state of stress performance checking and calculating all, to mention points with jack. For construction of foundation and support structure or the lower should be checking the bearing capacity and the overall stability, guaranteed under the most unfavorable conditions sufficient security. Sync value of each action point should be selected by calculating the reasonable construction.
Ways to enhance the principle of choice, one seeks to reduce the height of the load-bearing structure, to ensure its stability, the second is to ensure that the steel structure or equipment was promoted stability and security in place in ascension. Determine lifting points of the number and location of the basic principles are: First, to ensure that equipment is lifted steel or stability during the lift of. In ensuring the safety and quality of the premise, to minimize the lifting points. Enhance the carrying capacity of the device itself meet the design requirements. Lifting equipment selection principles are: to meet the upgrade requirements of the force, compact, durable, easy maintenance, meet the engineering needs (such as stroke, enhance the speed, security, etc.).
Main technical characteristics 3. Slip law
Sliding method has broad applicability. In addition to one-way truss, the structural rigidity for the smaller two-way truss or truss by adding support points (decrease span), increase the width of the assembly platform, while increasing the number of truss assembly on the platform, the same method can be used to install slip.
Slip propulsion device can be computer-controlled synchronized hydraulic crawler. High degree of automation equipment, flexible operation, safety, and high reliability, using a wide versatility.
4. The main technical measures slip law
1) preparation of Guangzhou Steel construction program
Preparation of construction plan to guide the construction, comprising: a sliding unit division, and slide assembly platform erection, assembly height, traction system, points slip or cumulative slip, off the shelf in place, construction monitoring, contingency plans.
2) high-altitude platform assembly and erection truss assembly.
3) Set the sliding track.
4) Install the synchronization slip system.
5) stress and strain monitoring: to ensure the construction in a controlled state.
5. Guangzhou Steel Scope
(1) sports stadiums, theaters, hangars, steel bridge (gallery) and other large span roof and steel structure assembled with a ground conditions, when there are better peripheral support conditions, and can be used to enhance the overall lifting technology.
(2) enhancing the overall steel tower antenna masts, power station boilers and other ultra member.
Enhancing the overall (3) large gantry crane girder, boilers and other large equipment.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
日韩精品一区二区三区av| 可以用网免费看的av黄| 日本疯狂抽插小骚穴视频| 涩涩涩综合在线亚洲第一| 日本全部三级下载 下载| 久99久热只有精品国产| 直接进入色网站| 美女吃鸡巴插逼图的歌词| 裸体美女大鸡巴狠狠操她 | 快操我骚逼视频| 亚洲国产精品久久性色av| 亚洲Aⅴ午夜福利精品区| 欧美日韩一区二区三区精品| 日日日日碰日日摸日日澡| 亚洲一区无码精品色下载| 精品久久天干天天天按摩| 和教官们啪啪日常np高h| 一级片免a在线免费视频| 国产大尺度视频在线观看| 肥老太操穴视!频一级片| 公与2个熄乱理| 国产浮力影院,草草影院| 亚洲AV人人澡人人爽牛| 亚洲一区二区三区精品日韩| 欧美日韩国产卡通一二区| 国产免费高清福利拍拍拍| 黑巨人与欧美精品一区| 告诉主人你的逼逼痒不痒| 扒开腿揉捏花蒂h动态图| 我把六十老女人弄高潮了| 精品熟女碰碰人人A久久| 中文字幕美腿丝袜校园春色| 午夜无码片在线观看影视| 亚洲午夜福利院在线观看| 3d真人肉动漫在线观看| 国产一区二区区在线观看| 国产剧勾引女友闺蜜啪啪| 蜜汁噜噜久久噜噜久久久| 一区二区三区黄色一级片| 国产欧美日韩a片免费软件| 屌鸡视频大黑屌|