raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:5068

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
我要看在线播放的黄片儿| 韩国演艺圈悲惨一区二区| 亚洲av无码国产精品永久一区| 白嫩欧美美女被巨屌抽插| 亚洲大尺度AV无码中文| 欧美精品一区二区三区精品| 成人免费av一区二区三区 | 东北大鸡吧操东北美女逼| 女生迈开腿让男生打扑克| 国产在线精品一| 1717射国产精品视频| 黄色电影免费观看| 91人妻子人人做人人爱| 操屄操屄操大屄| av激情小说色综合天天| jk制服AV网站免费进| 麻豆亚洲女人一区二区三区| 日本免费新一区二区三区| 啊啊啊啊嗯视频| 天天在线观看免费草草草草| 苍井空51分钟无码电影| 美女又爽又喷奶观看免费| 超级大肥屄视频| 裸体草逼视频网| 打几把搞美女被操控操哭| 免费看中国人大鸡巴操逼| 男人鸡巴插美女| 亚洲日日日夜夜夜夜夜夜 | 欧美久久久精品一区二区| 五月天无码视频| 扒开双腿抽打花蒂惩罚室| 在线精品酒店偷拍视频网| 和尚操骚妇逼逼| 91精品一区二区三区蜜桃| 成人AV中文字幕在线观| 亚洲综合一区二区国产精品| 亚洲色婷婷一区二区三区| 国产肥胖老太婆日逼视频| 韩国三级网站在线观看视频 | 少妇扒开双腿自慰出白浆| 免费一级毛片激情高潮强|