1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:5040

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
欧美日韩精品福利一区二区| 美女射精甜阴穴视频网站| 国产精品福利网站在线观看| 亚洲国产综合自在线婷婷| 精品一区二区三区爆白浆| 青娱乐首页91| 欧美av日韩a国产av| 欧洲舔大吊大屄| 午夜国产羞羞羞国产精品| 爱爱插一区二区| 熟女少妇国内精品一区二区| 人人插人人狠人人爽超碰| 久久久噜噜噜久久中文字幕色伊伊| 国产又色又爽无遮挡免费| 男人猛插女人视频免费看| 免费黄视频在线| 日本男人在家操女人骚逼| 挺进绝色邻居的紧窄小肉| 色婷婷免费在线视频观看| 成熟丰满熟妇av无码区| 欧美美女被干B| 欧美日韩一区高清在线观看| 中文字幕在线视频一字幕| 日本高龄老妇60路交尾| 大黑吊操逼视频| 国产一区二区不卡视频在线 | 日韩高清av一区二区三| 亚洲天堂男人的天堂在线| 漫画韩漫画免费在线观看| 欧美成年人网站在线观看| 欧美操逼免费试看小视频| 爆插18岁骚逼| 波罗野结衣被躁57分钟| 美女野外尻比玩鸡巴视频| 欧美日韩视频不卡一二区| AV亚欧洲日产国码无码| 国产91小视频在线观看| 亚洲av网一区二区三区| 亚洲精品九一国产九九蜜桃| 美女插插流淫水| 外国人日比视频|