娇妻借朋友高h繁交h,公交车伦流澡到高潮hnp,六月婷婷网视频在线观看,天堂√最新版中文在线

Language:CHINESESENGLISH

Home > News > Engineering Technology: General requirements for inspection of steel structure engineering foundation
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.e-sosa.com

Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4780

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
顶着熟睡的丝袜美腿麻麻| 久久国产精品一区二区三区| 国产更衣室视频在线观看| 无罩大乳的熟妇正在播放| 成全视频在线观看免费高清版| 国产精品久久久国产精品| 大肌巴日小个子女人视频| 操逼视频网址下| 白丝污污污污网站白丝带| 你懂得亚洲社区午夜福利| 五月婷婷激情综合网在线| 网友自拍第一页亚洲欧美| 乡村艳情之蜜桃深处甜牛奶| 无码性午夜视频在线观看| 色婷婷国产一区二区三区| 亚洲精品中文网av网站| 中文字幕在线第一页日韩| 国产三级精品久久久电影| 在线超B级视频在线观看| 玖玖热麻豆国产精品视频| 亚洲综合第一页成人无码| 国产一区二区三区九九视频| 沧元图免费观看完整版高清| 精品福利三区3d卡通动漫| 国产精品丝袜熟女一二三| 每一根毛都看得清清楚楚| 欧美 国产 在线一区三区| 国产午夜福利免费视频92| 伊人网av在线免费观看| 日本成人人网站在线观看| 国产欧美另类激情久久久| 男攻男受过程无遮掩视频| 中日韩黄色大片免费观看| 无码精品黑人一区二区三区| 成人亚洲欧美一区二区三区| av天堂久久天堂色综合| 国产午夜免费区二区三区| 2019国产品在线观看| 免费看男女高潮又爽又猛| 无人区一线二线三线乱码| 男人把女人捅爽了的视频|