Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2675

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
欧美日韩在线综合一二三区| 亚洲娇小美女穴| 蜜臀aⅴ国产精品久久久久| 亚洲精品无打码| 给我个逼操操吧| 女子鸡鸡操鸡鸡视频应用| 日韩黄片无打码在线观看| 黑人大吊肏白人美女学生| 粉嫩无毛馒头阴偷拍视频| 亚洲天堂日韩欧美在线播放| 亚洲中文久久久精品无码| 国产黄色看三级91大片| AV无码无在线观看麻豆| 老熟妇高潮一区二区三区| 日本高清无一区二区三区 | 一区二区三区国产日韩欧美| 日日日日日日日日日日操| 一区二区三区欧美日韩不卡| 女生和男生日逼视频网站| 99久久久无码一区二区| 精品亚洲成a人在线播放| 穿丁字裤让大吊进入骚穴| 国产精品高清一区二区不卡| 国产精品乡下勾搭老头1| 浮力影院路线路1路线2| 亚洲黄色网络电影国产av| 插鸡鸡网站骚逼| 黄色网站操逼女| 美女被强奸到高潮的视频| 白丝少萝自慰大全福利姬| 国产打屁股调教在线观看| 想外国大鸡巴插我啊啊啊| 日本大香蕉高清在线观看| 大学生特殊的按摩精油| 他把我下面日出水了视频| 揉逼逼鸡巴操逼肉穴视频| 日韩欧美自拍| 日本做受高潮好舒服视频| 人妻超爽视频一区二区三区| 日本伦理色呦呦在线观看| 免费美女艹逼啊啊啊啊啊|